
Eisenhower High School
Yakima, WA
332,674 Sqft
Date Completed
2014
Square Footage
Graham Construction
General Contractor
Architect
NAC Architecture
This all-new, 333,000 SF high school building was the largest in the state at the time of construction. All work took place while the existing high school remained in service and fully occupied on the same site. Demolition of the old facility proceeded once the new building was delivered for owner occupancy. It included a 2500 seat gymnasium, an 800 seat auditorium with orchestra pit, science and computer labs, workout center, video production, drafting classrooms, metal and wood shop facilities and a cafeteria with food services to host 2400 students.